Major Work Activity C – Installs, Tests And Services Sewers, Sewage Treatment Systems And Drainage, Waste And Vents Systems

Task C-8 Installs, tests and services sewers

Task Descriptor

Plumbers install both sanitary and storm sewers. They may be responsible for the sizing of the sewer as well as installing manholes, catch basins and piping. For the purpose of this standard, service includes troubleshooting, diagnosing, maintenance and repairs.

C-8.01 Sizes pipe for sewers

Essential Skills

Document Use, Numeracy, Thinking

NL

NS

PE

NB

QC

ON

MB

SK

AB

BC

NT

YT

NU

yes

yes

yes

yes

NV

yes

yes

yes

yes

yes

NV

NV

NV

Skills

Performance Criteria

Evidence of Attainment

C-8.01.01P

identify fixtures and equipment

fixtures and equipment are identified for hydraulic load using blueprints

C-8.01.02P

identify roofs and paved surfaces

roofs and paved surfaces are identified for hydraulic load

C-8.01.03P

calculate total hydraulic load of building

calculations of hydraulic load correspond to appropriate tables contained in the NPC

C-8.01.04P

refer to sewer sizing tables in the NPC

sewer sizing tables in the NPC are referred to obtain size of sewer pipe

Range of Variables

fixtures and equipment include: condensate drains, sump pumps, sinks, water closets, lavatory

Knowledge

Learning Outcomes

Learning Objectives

C-8.01.01L

demonstrate knowledge of sanitary drainage, storm and combination drainage systems, their components, applications and operation

interpret codes and regulations pertaining to sanitary drainage systems

interpret codes and regulations pertaining to storm and combination drainage systems

interpret information pertaining to sanitary drainage, storm and combination drainage systems found on drawings and specifications

identify sanitary drainage system components and describe their purpose and applications

identify storm and combination drainage system components and describe their purpose and applications

identify the factors to consider when sizing sanitary drainage, storm and combination drainage systems components

C-8.01.02L

demonstrate knowledge of the procedures used to determine and transfer grade and elevation measurements for sanitary drainage systems

identify the procedures used to determine hydraulic load on sanitary drainage, storm and combination drainage systems

Range of Variables

sanitary drainage system components include: piping, fixtures, drains, traps, cleanouts, joints and connections, backwater valves, fire stopping, sewage sumps, macerating toilet systems, expansion joints

storm and combination drainage system components include: piping, roof drains, area drains, fire stopping, expansion joints, storm water management devices

factors include: hydraulic load, code requirements, grade

procedures include: conversion factors, code requirements

C-8.02 Installs manholes and catch basins

Essential Skills

Document Use, Working with Others, Thinking

NL

NS

PE

NB

QC

ON

MB

SK

AB

BC

NT

YT

NU

yes

yes

yes

yes

NV

yes

yes

yes

yes

yes

NV

NV

NV

Skills

Performance Criteria

Evidence of Attainment

C-8.02.01P

locate and size manholes and catch basins

manholes and catch basins are located and sized according to drawings, NPC, AHJ and specifications

C-8.02.02P

select and use tools and equipment

tools and equipment are used to ensure base is level and stable

C-8.02.03P

channel bottom of manhole

bottom of manhole is channeled to direct waste

C-8.02.04P

select, lubricate and place gaskets

gaskets are selected, lubricated and placed to ensure manholes and catch basins are watertight and to avoid damage or reaction between lubricant and gaskets

C-8.02.05P

modify manholes and catch basins for new laterals

manholes and catch basins are modified for new laterals by making additional penetrations while maintaining structural integrity

C-8.02.06P

seal penetration points

penetration points are sealed to ensure water tightness

Range of Variables

tools and equipment include: levels, compactors and rigging, hoisting and lifting equipment

Knowledge

Learning Outcomes

Learning Objectives

C-8.02.01L

demonstrate knowledge of manholes and catch basins, their components, applications and operation

identify hazards and describe safe work practices pertaining to manholes and catch basins

interpret codes and regulations pertaining to manholes and catch basins

interpret information pertaining to manholes and catch basins found on drawings and specifications

identify tools and equipment relating to manholes and catch basins and describe their applications and procedures for use

identify the types of manholes and catch basins and describe their characteristics and applications

C-8.02.02L

demonstrate knowledge of the procedures used to determine and transfer grade and elevation measurements for manholes and catch basins

identify tools and equipment to determine the grade and elevation

C-8.02. 03L

demonstrate knowledge of the procedures used to lay out and install manholes and catch basins

describe the procedures used to install manholes and catch basins

describe the procedures used to protect manholes and catch basins according to mechanical specifications

Range of Variables

hazards include: trenching, confined spaces, pinch points, hoists, oxygen quality

procedures used to install include: locating, identifying, backfilling

procedures used to protect include: insulating, supporting, backfilling

C-8.03 Installs piping for sewers

Essential Skills

Document Use, Thinking, Working with Others

NL

NS

PE

NB

QC

ON

MB

SK

AB

BC

NT

YT

NU

yes

yes

yes

yes

NV

yes

yes

yes

yes

yes

NV

NV

NV

Skills

Performance Criteria

Evidence of Attainment

C-8.03.01P

select piping material

piping material is selected according to NPC, AHJ, specifications and site requirements

C-8.03.02P

identify benchmark

benchmark is identified to set grade or offset for piping

C-8.03.03P

lay out piping

piping is laid out according to NPC, drawings, AHJ, specifications and site requirements and conditions

C-8.03.04P

grade pipe

pipe is graded according to NPC and AHJ

C-8.03.05P

verify pipe grade

pipe grade is verified using tools and equipment

C-8.03.06P

select and install cleanouts

cleanouts are selected and installed according to NPC, AHJ, specifications and site requirements

C-8.03.07P

verify no cross-connection is present

the presence of no cross-connection is verified between storm and sanitary sewers using various methods

C-8.03.08P

compact soil

soil is compacted using backfill material to ensure stable base and to prevent damage to piping according to NPC, AHJ and specifications

Range of Variables

tools and equipment include: laser and builder’s levels

methods include: dye tests, visual inspections

Knowledge

Learning Outcomes

Learning Objectives

C-8.03.01L

demonstrate knowledge of sewers, their components, applications and operation

identify hazards and describe safe work practices pertaining to the installation of sewers

interpret codes and regulations pertaining to sewers

interpret information pertaining to sewers found on drawings and specifications

identify tools and equipment relating to the installation of sewers and describe their applications and procedures for use

identify the types of sewers and describe their characteristics and applications

identify piping for sewers and describe their purpose and applications

C-8.03.02L

demonstrate knowledge of the procedures used to determine and transfer grade and elevation measurements for sewers

describe the procedures used to grade piping for sewers

calculate elevations and inverts for sewers

C-8.03.03L

demonstrate knowledge of the procedures used to lay out and install piping for sewers

describe the procedures used to rough-in and install piping for sewers

describe the procedures used to install piping for sewers

describe the procedures used to protect piping for sewers according to mechanical specifications

Range of Variables

hazards include: trenching, confined spaces, pinch points, hoists, oxygen quality

types of sewers include: storm, waste

procedures used to install include: safety considerations (trenching, confined space, points of access), support, protection

procedures used to protect include: insulating, supporting, backfilling, identifying

C-8.04 Tests manholes, catch basins and piping for sewers

Essential Skills

Thinking, Reading, Document Use

NL

NS

PE

NB

QC

ON

MB

SK

AB

BC

NT

YT

NU

yes

yes

yes

yes

NV

yes

yes

yes

yes

yes

NV

NV

NV

Skills

Performance Criteria

Evidence of Attainment

C-8.04.01P

use testing equipment

testing equipment is used to detect faults and to confirm operation meets design specifications

C-8.04.02P

perform sensory inspection

sensory inspection is performed to detect plumbing system problems

C-8.04.03P

perform pressure test

pressure test is performed according to NPC and AHJ

C-8.04.04P

perform test on manholes and catch basins

manholes and catch basins are tested by using methods to ensure watertight seal according to AHJ and specifications

Range of Variables

testing equipment include: balloons, inflatable test balls, test plugs, mandrel

faults include: cracks, corrosion, inadequate flow

sensory inspection includes: auditory, visual

methods include: hydrostatic, smoke and air testing, mandrel test

Knowledge

Learning Outcomes

Learning Objectives

C-8.04.01L

demonstrate knowledge of manholes, catch basins and piping for sewers and their application

identify types of manholes, catch basins and piping for sewers and describe their characteristics and applications

C-8.04.02L

demonstrate knowledge of procedures used for testing manholes, catch basins and piping for sewers

describe the procedures used to test and troubleshoot manholes, catch basins and piping for sewers

identify testing equipment for manholes, catch basins and piping for sewers

identify potential problems and faults with manholes, catch basins and piping for sewers

Range of Variables

testing equipment include: balloons, inflatable test balls, test plugs, mandrel

faults include: cracks, corrosion, inadequate flow

C-8.05 Services manholes, catch basins and piping for sewers

Essential Skills

Writing, Document Use, Reading

NL

NS

PE

NB

QC

ON

MB

SK

AB

BC

NT

YT

NU

yes

yes

yes

yes

NV

yes

yes

yes

yes

yes

NV

NV

NV

Skills

Performance Criteria

Evidence of Attainment

C-8.05.01P

select and use tools and equipment

tools and equipment are selected and used according to applications

C-8.05.02P

perform scheduled maintenance of systems

scheduled maintenance of system is performed according to type of design and AHJ

C-8.05.03P

verify operation of manholes, catch basins and piping for sewers

operation of manholes, catch basins and piping for sewers is verified according to AHJ

C-8.05.04P

inspect manholes, catch basins and piping for sewers

manholes, catch basins and piping for sewers are inspected for conditions requiring maintenance

C-8.05.05P

determine whether components require replacement or repair

components are determined to be in need of repair or replacement according to industry standard

C-8.05.06P

determine required isolation of system

isolation of system is determined according to required maintenance

C-8.05.07P

notify system owner of need to isolate and execute isolation

owner is notified and isolation is executed

C-8.05.08P

clean components

components are cleaned to prolong life of system and adequate flow

C-8.05.09P

replace components

components are replaced according to manufacturers’ specifications

C-8.05.10P

repair components

components are repaired according to manufacturers’ specifications

C-8.05.11P

complete required documentation

documentation is completed according to AHJ and company policies

C-8.05.12P

return system to service and verify system operation

system is returned to service and system operation is verified to meet design specifications

Range of Variables

conditions requiring maintenance includes: wear, noise, leaks, corrosion

components include: backwater values, leak seals, covers, grates

documentation includes: service reports, maintenance reports

Knowledge

Learning Outcomes

Learning Objectives

C-8.05.01L

demonstrate knowledge of manholes, catch basins and piping for sewers, their components, applications and operation

identify hazards and describe safe work practices pertaining manholes, catch basins and piping for sewers

interpret codes and regulations pertaining to manholes, catch basins and piping for sewers

interpret information pertaining to manholes, catch basins and piping for sewers found on drawings and specifications

identify tools and equipment relating for servicing manholes, catch basins and piping for sewers and describe their applications and procedures for use

identify the types of manholes, catch basins and piping for sewers, and their components and describe their characteristics and applications

identify the factors to consider when servicing manholes, catch basins and piping for sewers

C-8.05.02L

demonstrate knowledge of the procedures used to repair and troubleshoot manholes, catch basins and piping for sewers

describe the procedures used to replace manholes, catch basins and piping for sewers

describe the procedures used to protect manholes, catch basins and piping for sewers

describe the procedures used to maintain and repair manholes, catch basins and piping for sewers

describe the procedures used to troubleshoot manholes, catch basins and piping for sewers

Range of Variables

safe work practices include: confined space, point of access, shoring

factors include: manufacturers’ specifications, condition of manholes, catch basins and piping for sewers

Task C-9 Installs, tests and services sewage treatment systems

Task Descriptor

Sewage treatment systems may encompass holding and septic tanks, absorption fields and sewage treatment plants. Regulations concerning the installation of sewage treatment systems may vary by jurisdiction. Additional certification may be required in some jurisdictions to allow plumbers to plan and install these systems. Plumbers may be required to maintain and repair these systems and must have basic knowledge of how they are planned, installed and operated. For the purpose of this standard, service includes troubleshooting, diagnosing, maintenance and repairs.

C-9.01 Plans installation of sewage treatment systems

Essential Skills

Thinking, Document Use, Oral Communication

NL

NS

PE

NB

QC

ON

MB

SK

AB

BC

NT

YT

NU

yes

yes

yes

yes

NV

yes

yes

yes

no

no

NV

NV

NV

Skills

Performance Criteria

Evidence of Attainment

C-9.01.01P

determine type of system required

type of required system is determined by performing percolation tests and by identifying factors

C-9.01.02P

prepare and submit a site plan to AHJ

site plan is prepared and submitted to AHJ in order to obtain permits

C-9.01.03P

select and size sewage treatment system components

sewage treatment system components are selected and sized according to AHJ

C-9.01.04P

determine proper depth of piping and components

proper depth of piping and components are determined according to AHJ

C-9.01.05P

confirm that adequate bedding material is present

presence of adequate bedding material is confirmed according to type of system and AHJ

Range of Variables

factors include: soil conditions, available space for system, expected daily volume of sewage

sewage treatment system components include: pumps, septic tanks, absorption fields

Knowledge

Learning Outcomes

Learning Objectives

C-9.01.01L

demonstrate knowledge of private sewage treatment systems, their components, applications and operation

identify hazards and describe safe work practices pertaining to private sewage treatment systems

interpret codes and regulations pertaining to private sewage treatment systems

interpret information pertaining to private sewage treatment systems found on drawings and specifications

identify tools and equipment relating to private sewage treatment systems and describe their applications and procedures for use

identify types of private sewage treatment systems and describe their characteristics and applications

identify private sewage treatment system components and describe their purpose and applications

identify the factors to consider when planning private sewage treatment systems

identify the factors to consider when sizing private sewage treatment system components

describe the procedures used to size private sewage treatment system components

C-9.01.02L

demonstrate knowledge of public sewage treatment systems, their components, applications and operation

describe the types and operation of public sewage treatment facilities

identify hazards and describe safe work practices pertaining to public sewage treatment systems

interpret codes and regulations pertaining to public sewage treatment systems

interpret information pertaining to public sewage treatment systems found on drawings and specifications

identify tools and equipment relating to public sewage treatment systems and describe their applications and procedures for use

Range of Variables

hazards include: health hazards, environmental hazards

types of private sewage treatment systems include: raised, slope and sand, pumped,

private sewage treatment system components include: leaching chambers, distribution box, septic tank, holding tanks, effluent filter

factors include: location (system position, clearances, relation to water table, sensitive areas), soil conditions/properties (percolation test, soil test)

public sewage treatment facilities include: lagoon, plant

C-9.02 Installs sewage treatment system components

Essential Skills

Document Use, Thinking, Working with Others, Continuous Learning

NL

NS

PE

NB

QC

ON

MB

SK

AB

BC

NT

YT

NU

yes

yes

yes

yes

NV

yes

yes

yes

no

no

NV

NV

NV

Skills

Performance Criteria

Evidence of Attainment

C-9.02.01P

select and use tools and equipment

tools and equipment are selected according to applications

C-9.02.02P

determine elevation and position of piping and components

elevation and position of piping and components are determined according to site conditions

C-9.02.03P

install and secure tanks

tanks are installed and secured according to AHJ, specifications and site conditions

C-9.02.04P

lubricate and place gaskets

gaskets are lubricated and placed to ensure tanks and components are watertight

C-9.02.05P

assemble, place and install pipe and components

pipe and components are assembled, placed and installed to specified grade in NPC and AHJ

Range of Variables

tools and equipment include: rigging, hoisting and lifting, excavation

piping and components include: pumps and siphons, filters, ejectors, tanks, controls

site conditions include: high water table, limiting layer

gaskets include: rubber O-rings and butyl rubber seals

Knowledge

Learning Outcomes

Learning Objectives

C-9.02.01L

demonstrate knowledge of sewage treatment systems, their components, applications and operation

identify hazards and describe safe work practices pertaining to sewage treatment systems

interpret codes and regulations pertaining to sewage treatment systems

interpret information pertaining to sewage treatment systems found on drawings and specifications

identify tools and equipment relating to sewage treatment systems and describe their applications and procedures for use

identify types of sewage treatment systems and describe their characteristics and applications

identify private sewage treatment system components and describe their purpose and applications

identify public sewage treatment system components and describe their purpose and applications

identify the factors to consider when planning and installing sewage treatment systems

C-9.02.02L

demonstrate knowledge of the procedures used to install sewage treatment systems

describe the procedures used to install sewage treatment systems

describe the procedures used to protect sewage treatment systems

describe the procedures used to determine grade and elevation for piping and components

Range of Variables

hazards include: health hazards, environmental hazards

private sewage treatment system components include: leaching chambers, distribution box, septic tank, holding tanks, effluent filter

public sewage treatment system components include: pumps, strainers, lift stations

factors include: location (system position, clearances, relation to water table, sensitive areas), soil conditions/properties (percolation test, soil test)

C-9.03 Tests sewage treatment systems and components

Essential Skills

Thinking, Document Use, Reading

NL

NS

PE

NB

QC

ON

MB

SK

AB

BC

NT

YT

NU

yes

yes

yes

yes

NV

yes

yes

yes

no

no

NV

NV

NV

Skills

Performance Criteria

Evidence of Attainment

C-9.03.01P

use testing equipment

testing equipment is used to detect faults

C-9.03.02P

perform systems check to analyze performance

systems check is performed to analyze performance according to design specifications

C-9.03.03P

perform pressure test

pressure test is performed according to NPC and AHJ

C-9.03.04P

perform sensory inspection

sensory inspection is performed to detect sewage treatment system problems

Range of Variables

testing equipment include: balloons, inflatable test balls, test plugs, mandrels

faults include: leaks, inadequate grade, corrosion

Knowledge

Learning Outcomes

Learning Objectives

C-9.03.01L

demonstrate knowledge of sewage treatment systems and their application

identify types of sewage treatment systems and describe their characteristics and applications

identify hazards and describe safe work practices pertaining to sewage treatment systems

C-9.03.02L

demonstrate knowledge of testing equipment and procedures used for testing sewage treatment systems

describe the procedures used to test sewage treatment systems

identify sewage treatment systems testing equipment

Range of Variables

testing equipment include: balloons, inflatable test balls, test plugs, mandrels

C-9.04 Services sewage treatment systems and components

Essential Skills

Thinking, Document Use, Writing

NL

NS

PE

NB

QC

ON

MB

SK

AB

BC

NT

YT

NU

yes

yes

yes

yes

NV

yes

yes

yes

yes

no

NV

NV

NV

Skills

Performance Criteria

Evidence of Attainment

C-9.04.01P

inspect equipment

equipment is inspected for conditions that require repair

C-9.04.02P

interpret client’s information

client’s information is interpreted to assist in the diagnostic process

C-9.04.03P

perform sensory inspection

sensory inspection is performed to detect sewage treatment system for conditions requiring service

C-9.04.04P

select and use tools and equipment

tools and equipment are selected and used according to applications

C-9.04.05P

perform scheduled servicing of systems

scheduled servicing of system is performed according to system specifications and AHJ

C-9.04.06P

verify operation of sewage treatment system

operation of sewage treatment system is verified according to system design

C-9.04.07P

determine whether components require replacement or repair

components are determined to be in need of repair or replacement according to industry standard

C-9.04.08P

determine required isolation of system

isolation of system is determined according to service required

C-9.04.09P

notify system owner of need to isolate and execute isolation

owner is notified and isolation is executed

C-9.04.10P

clean components

components are cleaned to prolong life of system and adequate flow

C-9.04.11P

replace components

components are replaced according to manufacturers’ specifications

C-9.04.12P

repair components

components are repaired according to manufacturers’ specifications

C-9.04.13P

complete required documentation

documentation is completed according to AHJ and company policies

C-9.04.14P

return system to service and verify system operation

system is returned to service and system operation is verified according to system design

Range of Variables

conditions requiring repair includes: wear, noise, leaks, corrosion

documentation includes: service reports, maintenance reports

Knowledge

Learning Outcomes

Learning Objectives

C-9.04.01L

demonstrate knowledge of sewage treatment system, their components, applications and operation

identify hazards and describe safe work practices pertaining sewage treatment system

interpret codes and regulations pertaining to sewage treatment system

interpret information pertaining to sewage treatment system found on drawings and specifications

identify tools and equipment related to servicing sewage treatment system and describe their applications and procedures for use

identify types of sewage treatment system, and their components and describe their characteristics and applications

identify the factors to consider when servicing sewage treatment system

C-9.04.02L

demonstrate knowledge of the procedures used to maintain, repair and troubleshoot sewage treatment system

describe the procedures used to replace sewage treatment system and/or components

describe the procedures used to protect sewage treatment system

describe the procedures used to maintain and repair sewage treatment system and components

describe the procedures used to troubleshoot sewage treatment system and components

describe the importance of filling out service documentation related to maintenance and repair

Range of Variables

components include: backwater values, leak seals, covers, grates

hazards include: health hazards, environmental hazards, access, confined space

factors include: manufacturers’ specifications, condition of sewage treatment system

Task C-10 Installs, tests and services interior drainage, waste and vent (DWV) systems

Task Descriptor

Plumbers install both underground and above-ground piping and components for DWV systems. Underground systems are defined as piping systems in direct contact with the earth. Embedded components are encased in concrete or other materials. For the purpose of this standard service includes maintain, troubleshoot and repair.

C-10.01 Sizes pipe for interior drainage, waste and vent (DWV) systems

Essential Skills

Numeracy, Document Use, Thinking

NL

NS

PE

NB

QC

ON

MB

SK

AB

BC

NT

YT

NU

yes

yes

yes

yes

NV

yes

yes

yes

yes

yes

NV

NV

NV

Skills

Performance Criteria

Evidence of Attainment

C-10.01.01P

identify fixtures and equipment

fixtures and equipment are identified for hydraulic load using blueprint

C-10.01.02P

identify roofs and paved surfaces

roofs and paved surfaces are identified for hydraulic load

C-10.01.03P

calculate total hydraulic load of building

calculations of hydraulic load correspond to tables contained in the NPC

C-10.01.04P

size sanitary drainage system and associated vent piping

sanitary drainage system and associated vent piping are sized by calculating total hydraulic load according to NPC and AHJ

C-10.01.05P

size storm drainage system and associated vent piping

storm system are sized by calculating total hydraulic load according to NPC and AHJ

Range of Variables

fixtures and equipment include: condensate drains, sump pumps, sinks, water closets, lavatory

Knowledge

Learning Outcomes

Learning Objectives

C-10.01.01L

demonstrate knowledge of DWV systems, their components, applications and operation

identify hazards and describe safe work practices pertaining to DWV systems

interpret codes and regulations pertaining to DWV systems

interpret information pertaining to DWV systems found on drawings and specifications

explain the purpose of DWV systems

identify the types of DWV systems and describe their characteristics and applications

identify storm system components and describe their purpose and applications

C-10.01.02L

demonstrate knowledge of the procedures used to determine and transfer grade and elevation measurements for DWV systems

describe the procedures used to determine hydraulic load on sanitary DWV systems

describe the procedures used to determine hydraulic load on storm systems

describe the procedures used to grade piping for DWV systems

Range of Variables

storm system components include: piping, roof drains, area drains, fire stopping, expansion joints

procedures include: conversion factors, code requirements

C-10.02 Installs underground piping and components for interior drainage, waste and vent (DWV) systems

Essential Skills

Document Use, Numeracy, Thinking

NL

NS

PE

NB

QC

ON

MB

SK

AB

BC

NT

YT

NU

yes

yes

yes

yes

NV

yes

yes

yes

yes

yes

NV

NV

NV

Skills

Performance Criteria

Evidence of Attainment

C-10.02.01P

select and use tools and equipment

tools and equipment are selected and used according to applications

C-10.02.02P

select piping material

piping material is selected according to NPC, AHJ, specifications and site requirements

C-10.02.03P

identify benchmark

benchmark is identified to set grade or offset for piping

C-10.02.04P

lay out piping and components

piping and components are laid out according to NPC, drawings, AHJ, specifications and site requirements and conditions

C-10.02.05P

calculate required grade of piping

required grade of piping is calculated according to NPC and AHJ

C-10.02.06P

ensure excavation and compaction of trench

excavation and compaction of trench is ensured to prevent settling of piping and components

C-10.02.07P

install required pipe and components to proper grade

required pipe and components are installed to proper grade according to NPC and AHJ

C-10.02.08P

determine elevation and set embedded components

elevation of embedded components are determined and set in relation to finished floor

C-10.02.09P

protect and prepare pipe and components

pipe and components are protected and prepared for backfill

C-10.02.10P

backfill trench

trench is backfilled once testing is complete using appropriate material and ensuring adequate protection of piping according to NPC and AHJ

Range of Variables

tools and equipment include: tampers, jackhammers, levels, excavation equipment

embedded components include: drains, sumps, trap seal primer (TSP), cleanouts, pipes, interceptors

Knowledge

Learning Outcomes

Learning Objectives

C-10.02.01L

demonstrate knowledge of DWV systems, applications and operation

identify hazards and describe safe work practices pertaining to DWV systems

interpret codes and regulations pertaining to DWV systems

interpret information pertaining to DWV systems found on drawings and specifications

explain the purpose and functionality of DWV systems

identify the methods of backflow protection used in DWV systems

identify the types of DWV systems and describe their characteristics and applications

C-10.02.02L

demonstrate knowledge of the procedures used to determine and transfer grade and elevation measurements for DWV systems

determine and transfer grade and elevation for piping in DWV systems

describe the procedures used to install DWV systems in trenches

describe the procedures used to grade piping for DWV systems

C-10.02.03L

demonstrate knowledge of the procedures used to layout and install DWV systems

describe the procedures used to install DWV systems

identify the factors to consider when installing DWV systems components

describe the procedures used to protect DWV systems

Range of Variables

methods of backflow protection include: backwater valves and gate valves

procedures used to install include: safety considerations, support, protection

factors include: hydraulic load, code requirements

C-10.03 Installs piping and components for interior drainage, waste and vent (DWV) systems above-ground

Psychomotor Taxonomy

Complex

Essential Skills

Document Use, Thinking, Numeracy

NL

NS

PE

NB

QC

ON

MB

SK

AB

BC

NT

YT

NU

yes

yes

yes

yes

NV

yes

yes

yes

yes

yes

NV

NV

NV

Skills

Performance Criteria

Evidence of Attainment

C-10.03.01P

select and use tools and equipment

tools and equipment are selected and used according to applications

C-10.03.02P

select piping material

piping material is selected according to NPC, AHJ, specifications and site requirements

C-10.03.03P

lay out piping and components

piping and components are laid out according to NPC, drawings, AHJ, specifications and site requirements and conditions

C-10.03.04P

calculate required grade of piping

required grade of piping is calculated according to NPC

C-10.03.05P

install supports and hangers

supports and hangers are installed according to NPC and specifications

C-10.03.06P

install required pipe and components

required pipe and components are installed to grade according to NPC and specifications

C-10.03.07P

prepare and protect pipe and components

pipe and components are prepared for testing and protected from site conditions and thermal expansion

Range of Variables

tools and equipment include: torches, tubing cutters, hand and power saws

Knowledge

Learning Outcomes

Learning Objectives

C-10.03.01L

demonstrate knowledge of DWV systems, applications and operation

identify hazards and describe safe work practices pertaining to DWV systems

interpret codes and regulations pertaining to DWV systems

interpret information pertaining to DWV systems found on drawings and specifications

identify tools and equipment relating to DWV systems and describe their applications and procedures for use

explain the purpose and functionality of DWV systems

identify the methods of backflow protection used in DWV systems

identify the types of DWV systems and describe their characteristics and applications

C-10.03.02L

demonstrate knowledge of the procedures used to determine and transfer grade and elevation measurements for DWV systems

identify the factors to consider when installing DWV systems components

determine and transfer grade and elevation for piping in DWV systems

describe the procedures used to grade piping for DWV systems

C-10.03.03L

demonstrate knowledge of the procedures used to layout and install DWV systems

identify types of hangers and supports used to install DWV systems

describe the procedures used to install DWV systems and hangers and supports

describe the procedures used to protect DWV systems

Range of Variables

methods of backflow protection include: backwater valves, gate valves

factors include: hydraulic load, code requirements

C-10.04 Tests interior drainage, waste and vent (DWV) systems

Essential Skills

Document Use, Thinking, Oral Communication

NL

NS

PE

NB

QC

ON

MB

SK

AB

BC

NT

YT

NU

yes

yes

yes

yes

NV

yes

yes

yes

yes

yes

NV

NV

NV

Skills

Performance Criteria

Evidence of Attainment

C-10.04.01P

use testing equipment

testing equipment is used to detect faults and verify operation

C-10.04.02P

perform systems check to analyze performance

systems check is performed to analyze performance according to system design and AHJ

C-10.04.03P

perform pressure test

pressure test is performed according to NPC and AHJ

C-10.04.04P

perform sensory inspection

sensory inspection is performed to detect DWV system problems

C-10.04.05P

perform final test

final test is performed using required testing equipment

Range of Variables

testing equipment include: inflatable test balls, mechanical test plugs, gauge, smoke generating machine

faults include: leaks, inadequate grade

final tests include: smoke test, ball test, hydrostatic test, pneumatic test

Knowledge

Learning Outcomes

Learning Objectives

C-10.04.01L

demonstrate knowledge of interior DWV systems and their application

identify types of interior DWV systems and describe their characteristics and applications

identify hazards and describe safe work practices pertaining to DWV systems

C-10.04.02L

demonstrate knowledge of testing equipment and procedures used for testing interior DWV systems

describe the procedures used to test interior DWV systems

identify interior DWV system testing equipment

Range of Variables

testing equipment include: inflatable test balls, mechanical test plugs, gauge, smoke generating machine

C-10.05 Services piping and components for interior drainage, waste and vent (DWV) systems

Essential Skills

Continuous Learning, Thinking, Oral Communication

NL

NS

PE

NB

QC

ON

MB

SK

AB

BC

NT

YT

NU

yes

yes

yes

yes

NV

yes

yes

yes

yes

yes

NV

NV

NV

Skills

Performance Criteria

Evidence of Attainment

C-10.05.01P

interpret client’s information

client’s information is interpreted to assist in the diagnostic process

C-10.05.02P

inspect piping and components

piping and components are inspected for conditions that require service

C-10.05.03P

perform sensory inspection

sensory inspection is performed to detect DWV system for conditions requiring service

C-10.05.04P

select and use tools and equipment

tools and equipment are selected and used to service DWV systems

C-10.05.05P

perform scheduled servicing of systems

scheduled servicing of system is performed according to system design and AHJ

C-10.05.06P

verify operation of DWV system

operation of DWV system is verified according to system design

C-10.05.07P

determine whether pipes or components require replacement or repair

pipes or components are determined to be in need of repair or replacement according to industry standard

C-10.05.08P

determine required isolation of system

isolation of system is determined according to service requirements

C-10.05.09P

notify system owner of need to isolate and execute isolation

owner is notified and isolation is executed

C-10.05.10P

clean pipe and components

pipe and components are cleaned to prolong life of system and ensure adequate flow

C-10.05.11P

replace pipe and components

pipe and components are replaced according to manufacturers’ specifications

C-10.05.12P

repair pipe and components

pipe and components are repaired according to manufacturers’ specifications

C-10.05.13P

complete required documentation

documentation is completed according to AHJ and company policies

C-10.05.14P

return system to service and verify system operation

system is returned to service and system operation is verified according to system design

Range of Variables

components include: fittings, pipe, valves, sewage sumps, sewage lift, interceptors, specialty traps, expansion joints, wall plates, fire stopping, insulation

conditions requiring service includes: wear, noise, leaks, corrosion, blockage

documentation includes: service reports, maintenance reports

Knowledge

Learning Outcomes

Learning Objectives

C-10.05.01L

demonstrate knowledge of interior drainage, waste and vent (DWV) system equipment and components, their applications and operation

identify types of interior DWV systems and describe their characteristics and applications

identify tools and equipment relating to interior DWV systems and describe their applications and procedures for use

identify interior DWV system equipment and components and describe their purpose, operation and applications

C-10.05.02L

demonstrate knowledge of the procedures used to service interior DWV systems

interpret codes and regulations pertaining to interior DWV systems

describe the procedures used to service interior DWV system components

describe the procedures and components used to protect interior DWV systems and buildings

Range of Variables

equipment and components include: sewage sumps, sewage lift, interceptors, specialty traps

component used to protect include: expansion joints, wall plates, fire stopping, insulation

Date modified: