Appendix F – Task Profile Chart - Oil Heat System Technician
Block A – Common Occupational Skills
1. Uses tools and equipment.
- 1.01 Uses hand tools.
- 1.02 Uses power tools.
- 1.03 Uses powderactuated tools. (NOT COMMON CORE)
- 1.04 Uses measuring and testing equipment.
- 1.05 Uses hoisting, lifting and rigging equipment.
- 1.06 Uses ladders and platforms.
- 1.07 Uses soldering, flaring and threading tools.
- 1.08 Uses personal protective equipment (PPE) and safety equipment.
2. Organizes work.
- 2.01 Communicates with others.
- 2.02 Maintains clean and safe work environment.
- 2.03 Interprets codes and documentation.
- 2.04 Completes documentation.
- 2.05 Interprets drawings.
- 2.06 Performs basic distribution layout.
- 2.07 Organizes material and components.
- 2.08 Commissions appliances and components.
Block B – Fuel Supply and Storage Systems
3. Installs fuel storage tanks.
- 3.01 Selects fuel storage tanks.
- 3.02 Determines fuel storage tank location.
- 3.03 Prepares location for fuel storage tanks.
- 3.04 Positions fuel storage tanks.
- 3.05 Installs fuel storage tank components.
- 3.06 Installs fill and vent pipes.
4. Installs fuel supply system.
- 4.01 Selects fuel supply components.
- 4.02 Installs fuel supply components.
Block C – Oil-Fired Heating Systems
5. Installs and retrofits oil-fired and wood/oil appliances and components.
- 5.01 Selects appliances.
- 5.02 Positions appliances.
- 5.03 Installs components on appliance.
- 5.04 Connects fuel supply to appliance.
- 5.05 Connects electrical supply to appliance.
- 5.06 Connects vent/exhaust piping to appliance.
- 5.07 Installs dump zones for wood/oil systems.
- 5.08 Connects drain to appliance.
6. Installs forcedair heating systems.
- 6.01 Assembles ductwork.
- 6.02 Installs ductwork.
7. Installs hydronic heating systems.
- 7.01 Assembles boilers.
- 7.02 Installs hydronic distribution system.
- 7.03 Installs indirect water.
- 7.04 Installs oilfired water heater.
- 7.05 Installs hydronic heating system components.
Block D – Venting, Combustion and Make-Up Air
8. Installs venting systems.
- 8.01 Selects venting system.
- 8.02 Prepares locations for termination.
- 8.03 Installs venting components.
- 8.04 Secures venting system to structure.
9. Installs equipment and components for combustion air and make-up air.
- 9.01 Selects equipment and components.
- 9.02 Prepares location for equipment and components for combustion air and make-up air.
- 9.03 Assembles equipment and components.
- 9.04 Secures equipment and components to structure.
Block E – Electrical/Electronic Sytems
10. Installs electrical and electronic systems.
- 10.01 Selects controls and components.
- 10.02 Selects location of controls and components.
- 10.03 Installs controls and components.
11. Tests electrical and electronic systems.
- 11.01 Cycles appliance controls.
- 11.02 Checks operating and safety controls.
- 11.03 Checks accessories and components.
- 11.04 Sets up operating parameters.
Block F – Mainteance, Diagnosis, Repair and Removal
12. Maintains oilfired heating systems and components.
- 12.01 Checks oilfired heating system and components.
- 12.02 Cleans components.
- 12.03 Changes preventative maintenance components.
- 12.04 Lubricates moving components.
13. Diagnoses oilfired heating systems and components.
- 13.01 Checks for electrical problems.
- 13.02 Checks for burner problems.
- 13.03 Checks for distribution problems.
- 13.04 Checks for problems with combustion air and make-up air.
14. Repairs oilfired heating systems and components.
- 14.01 Corrects electrical problems.
- 14.02 Corrects burner problems.
- 14.03 Corrects distribution problems.
15. Removes appliances and components.
- 15.01 Decommissions appliances and components.
- 15.02 Disposes of waste products.
Menu du contenu de la page
- Date modified:
-