Appendix F – Task Profile Chart - Construction Craft Worker

Block A – Common Occupational Skills

1. Performs safety-related functions.

  • 1.01 Maintains safe work environment.
  • 1.02 Uses personal protective equipment (PPE) and safety equipment.

2. Uses and maintains tools and equipment.

  • 2.01 Maintains hand, power and powder-actuated tools.
  • 2.02 Uses rigging and hoisting equipment.
  • 2.03 Uses stationary equipment.
  • 2.04 Uses sandblaster.
  • 2.05 Uses mobile equipment.

3. Organizes work.

  • 3.01 Uses documentation.
  • 3.02 Communicates with others.

4. Performs routine trade activities.

  • 4.01 Handles construction materials.
  • 4.02 Performs site housekeeping and maintenance.
  • 4.03 Erects hoarding / enclosures.
  • 4.04 Installs membranes.
  • 4.05 Installs insulating materials.
  • 4.06 Establishes grades and elevations.
  • 4.07 Performs traffic control.
  • 4.08 Installs permanent and temporary fencing.

Block B – Site Work

5. Prepares site.

  • 5.01 Clears site.
  • 5.02 Sets up site facilities.
  • 5.03 Assists in installation of pilings.
  • 5.04 Builds access and egress roads.

6. Performs ground work.

  • 6.01 Locates underground utilities.
  • 6.02 Performs excavation.
  • 6.03 Installs excavating shoring.
  • 6.04 Performs backfill and compaction.

7. Services site.

  • 7.01 Addresses suspected hazardous materials.
  • 7.02 Controls water runoff.
  • 7.03 Sets up temporary lighting.
  • 7.04 Sets up generators and compressors.
  • 7.05 Performs site restoration.
  • 7.06 Manages tool crib.
  • 7.07 Recycles materials.

8. Performs basic demolition.

  • 8.01 Cuts materials.
  • 8.02 Dismantles existing structures and components.

9. Performs safety watches.

  • 9.01 Monitors hazardous gases.
  • 9.02 Performs fire watch.
  • 9.03 Performs bottle watch.
  • 9.04 Performs confined space watch.
  • 9.05 Monitors heaters.

Block C – Scaffolding and Access Equipment

10. Uses scaffolding.

  • 10.01 Erects scaffolding.
  • 10.02 Inspects scaffolding.
  • 10.03 Maintains scaffolding.
  • 10.04 Tends to scaffold erectors.
  • 10.05 Dismantles scaffolding.

11. Uses access equipment.

  • 11.01 Uses ladders.
  • 11.02 Uses power-elevated work platforms.
  • 11.03 Inspects access equipment.
  • 11.04 Maintains access equipment.

Block D – Concrete Work

12. Forms concrete.

  • 12.01 Installs formwork and shoring.
  • 12.02 Inspects assembled formwork.
  • 12.03 Dismantles formwork.
  • 12.04 Maintains formwork.

13. Places and finishes concrete.

  • 13.01 Mixes concrete.
  • 13.02 Transports concrete on site.
  • 13.03 Places concrete.
  • 13.04 Installs components in concrete.
  • 13.05 Assists with finishing concrete.
  • 13.06 Controls concrete curing process.

14. Modifies concrete.

  • 14.01 Drills/cores concrete.
  • 14.02 Prepares concrete for resurfacing.
  • 14.03 Performs concrete repair and refinishing.
  • 14.04 Creates expansion, control and isolation joints.

15. Places/Applies grout, epoxies and caulking.

  • 15.01 Places/Applies grout.
  • 15.02 Places/Applies epoxies.
  • 15.03 Applies caulking.

Block E – Masonry Work

16. Prepares for masonry work.

  • 16.01 Sets up masonry materials.
  • 16.02 Mixes mortars and grouts.

17. Tends to bricklayers.

  • 17.01 Cuts masonry units.
  • 17.02 Installs lintels and rough bucks.
  • 17.03 Washes masonry units.
  • 17.04 Installs refractory materials.
  • 17.05 Uses fireproofing materials.

Block F – Utilities and Pipeline

18. Installs utility piping for water and sewer installations.

  • 18.01 Installs pipe for water systems.
  • 18.02 Installs pipe for sewer systems.
  • 18.03 Installs catch basins and manholes.
  • 18.04 Modifies existing pipe.
  • 18.05 Assists with testing water and sewer lines.

19. Performs pipeline activities.

  • 19.01 Constructs right of ways.
  • 19.02 Performs pipeline installation.
  • 19.03 Performs pipeline maintenance.

Block G – Roadwork

20. Installs road surface material.

  • 20.01 Places road surface materials.
  • 20.02 Repairs road surfaces.

21. Installs roadwork components.

  • 21.01 Installs barriers.
  • 21.02 Installs road markings and signs.
  • 21.03 Installs culverts.
Date modified: